CITIGATE

Client

Regional Group

Project Description

Regional Group’s prestige business park campus occupies an 81-hectare site in Barrhaven/Central South Nepean. Fast tracking the project to meet user demands, both interim servicing strategies and innovative stormwater management techniques were employed. Campus design guidelines included the re-location and habitat reconstruction for the O’Keefe Drain. Multiple site plans for auto dealerships, retail land use and business park lands were completed in conjunction with the overall campus design.

The project involved the design and construction of the 4-lane divided arterial, Strandherd Drive east of Fallowfield Road. The Strandherd Drive portion of the project involved the design and construction of a water system, a portion of the South Nepean Collector system, storm drainage, road widening, sidewalks, cycle tracks, streetlighting, and traffic signals. City participation was conducted through a Technical Advisory Committee (TAC) consisting of various departments.